All that you need to know about Delhi Jal Board
The Delhi Jal Board, which was established by an Act of the Delhi Legislative Assembly on April 6, 1998, is dedicated to improving the water supply in Delhi.
The Delhi Jal Boards have been meeting the need for potable water inside the National Capital Territory for more than five decades. They bring natural, filtered water to India’s capital city, which has a population of more than a hundred and sixty thousand people.
The Revenue Management System (RMS), automates different Delhi Jal Board activities, including new water connections, collection, billing, and metering operations.Customers who desire a new connection from the Delhi Jal Board can use a specialized customer portal, which includes an online water connection application, online payment, online grievance application, application tracking, and SMS service. By offering consumers online and better services, the revenue management system aids the effectiveness of the Delhi Jal Board’s new connection team.
Requesting A New Water Connection
One can request a new water connection and learn about sewer difficulties by visiting the DJB consumer portable www.djb.go.The form can be downloaded by clicking here. The Delhi Jal Board’s online application form for a new connection is also accessible at the Delhi Jal Board’s Zonal Revenue Officer offices. It costs Rs. 10 to purchase, which includes the cost of the form as well as the processing charge. On all working days, the new water connection application can be submitted online or in person at the applicable Zonal Revenue Office. Any resident of Delhi who owns a tenant’s property and possesses sufficient proof of identity and property is eligible.
Only residents of areas under the administration of the NDMC and the Delhi Cantonment Board are eligible to apply for a water connection. Within 35 days of the ZRO’s satisfaction that the application is complete and all dues are paid, the applicable Delhi Jal board new connection will be sanctioned. Because water connections are sanctioned per dwelling, a person can only get one. Individual connections are permitted only for those units in the structure that are less than 15 meters tall.
The Steps to Getting A Bulk Water Connection
The following documentation must be submitted in the electronic form to the Zonal Revenue Office to receive a bulk Jal board new connection. The following are the details.
- The applicant’s request form.
- In AutoCAD or any other electronic format, the layout plan of all floor plans with area information. An electronic drawing of the key intent is preferred.
- On the map, there are detailed indications of the internal network where DJB will take over the area.
- Hydraulic computation and water demand scanned copy.
- The capacity of the UGR as well as its location for potable and non-potable water.
- Rooftop Rain Water Harvesting is Required.
Disclaimer: The views expressed above are for informational purposes only based on industry reports and related news stories. PropertyPistol does not guarantee the accuracy, completeness, or reliability of the information and shall not be held responsible for any action taken based on the published information.